Projects

Recent work, photographed on site.

Painting, waterproofing and construction jobs from 2026. Select any photo to open the full set.

Painting & preparationSeptember 2026

Two-storey building — exterior preparation

Full scaffolding along the façade while damaged areas of the wall were patched ahead of painting.

  • Scaffolding erected along the full façade
  • Damaged areas patched across both floors
  • Stairs and walkways kept clear beneath the scaffold

WaterproofingOctober 2026

Flat roof — liquid-applied coating

A two-part coating mixed on site and worked across a concrete roof slab.

Construction

Residential build — blockwork and structure

Load-bearing block walls, columns and concrete beams for a single-storey house.

PaintingOctober 2026

Double-storey house — exterior

Upper-floor walls and window surrounds worked from a mobile tower scaffold.

PaintingMarch 2026

Double-storey residence — exterior repaint

Repaint of a family home, with cracks patched before any paint went on.

Interior paintingMarch 2026

Vaulted ceiling with exposed timber trusses

Full-height interior painting from mobile scaffold towers.

Interior paintingJuly 2026

Double-height walls and hallways

Walls beneath a feature ceiling, worked from a two-level scaffold tower.

PaintingOctober 2026

Garage exterior

Garage walls and eaves painted from a ladder, with the base of the wall protected.

Next step

Planning a project?

Talk to Aliash. We’ll visit the site and give you a free quote.

Call WhatsApp